Pre-Installation Checklist

Prior to arriving on site to install an X200 system, use the following lap top set up and cables for communicating with the IPMI and data switches.

The Quantum VM installer consists of an OVA image which contains both the installation VM and the corresponding ActiveScale ISO.

NTP servers

To ensure consistent and reliable time synchronization, Quantum recommends configured internal NTP servers within the network environment. Internal NTP sources eliminate dependency on external connectivity, reduce false alerts, and provide better control and traceability over time synchronization.

Public NTP servers are often rate-limited, intermittently unreachable, or blocked by network firewalls, leading to unreliable synchronization and unnecessary system alerts.

Other requirements

The VM needs to be able to reach the different nodes which are being installed over the internal private VLANs of ActiveScale. This means that the network card in bridged mode needs to be connected to one of the switches of the ActiveScale systems and that that specific port on that switch needs to be in the same VLAN as the nodes which are being installed.

Power Requirements

Configuration Power Requirement
Twin Server with 90 drives 2400W each

Twin JBOD with 90 drives

1600W each

25/100GbE Data Switch

420W each

1GbE IPMI Switch

20W each

PDU Requirements

Planning ahead for power/ what we need to tell the customer.

Rack Requirements

The ActiveScale X200 storage system is designed to mount in 19” racks that meet the EIA 310 Rack Standard.

Requirement Description
Minimum Rack Depth The minimum recommended rack depth required is 1200 mm (47.24”) when the rack has doors. This depth allows for clean and efficient cable routing between the nodes and enclosures. It also provides extra space for rear mount vertical power distribution units (PDUs), which Quantum recommends.
Rail Kits The X200 chassis rail kits work with the EIA 310 Rack Standard and must have square, vertical rack mounting flanges. Round or threaded holes are not supported.
Rack Spacing
  • The vertical rack mounting flange spacing from the front flanges to the rear flanges must be set between 28”-30”. The X200 storage system cannot be installed unless the flanges fall within this range.

  • The rack requires a minimum of 36” clearance in front of it for initial enclosure installation and future service operations. See the image below

  • A minimum of 30” clearance is required at the back of the node for future service operations. This is measured from the back of the node and is independent of where the back of the rack is located.

Rack Size Each node consumes 2U of rack space and each enclosure consumes 4U of rack space.

Rack Installation Requirements