Remove and Replace the Power Supply
The Scalar i6H library contains redundant (2N) power supplies. The power supply is highly efficient, rated at 80 PLUS®, a performance specification that requires an 80% or higher energy efficiency at 10, 20, 50 and 100% of rated load with a true power factor of 0.9 or greater. The power supply connects to an outside power source and converts the input power to the AC and DC voltages used by the library components.
Your Scalar i6H power supply configuration is dependent on your drive configuration.
| Item | Name | Description |
|---|---|---|
|
1 |
LEDs |
Power Supply LEDs provide you with visual information that let you know the power supply is working correctly. Normal indications:
If the Fault LED is solid blue, or if the other two LEDs are off, you should check for RAS tickets to learn how to resolve the problem. |
| 2 | Handle | Used to remove and install the power supply. |
| 3 | Thumbscrews | Used to secure the power supply to the chassis. |
There are several ways to identify the failed power supply:
In the WebGUI, you can refer to the RAS ticket for the power supply failure under Status > RAS Tickets.
You can also select the Status WebGUI option and review the system Power Consumption status. The power supply to be replaced will have a status of Failed.
Use the LEDs on the power supply to identify the failed unit. In a failed power supply, the Fault LED is illuminated, and the AC OK and/or the DC OK LED is off.
-
Power the library down. If you have redundant power you don’t have to shut the library down. However, replacing a power supply with power applied will generate a RAS ticket.
In the WebGUI, select Shut Down from the admin menu on the Menu Bar.
- Unplug the power cord from the power supply.
- Loosen the thumbscrew.
- Pull the handle and slide the power supply out of the module.
- Slide the power supply into its slot until the front bezel is sitting flush against the back of the module.
- Tighten the thumbscrew until finger tight.
- Plug the power cord into the power supply. The library will begin start up operations.